Tradelossa worked on the new Santa Lucia airport with hauling and rigging operations of three heavy transformers located at the Santa Lucia Airport base.
The operations consisted of multiple loading and rigging of three transformers and their accessories in Texcoco, within the facilities of our clients with destination to the Santa Lucia Airport airbase, which once our teams arrived, we performed unloading maneuvers of all transformers along with all its accessories inside the airbase.
Dimensions of the three transformers:
6.22 meters long, 3.80 meters wide, 4.30 meters high, and a total weight of 64 tons.
During the course of this project, our team was in constant contact with our clients to ensure successful and on-time delivery, following all the rigorous safety and quality filters established for the project.
The operations were carried out with the support of our fleet and the experience of our maneuvering and assembly veteran, thus ensuring a successful closing of operations.