For almost a year Tradelossa realized the transportation tasks of 33 Coolers for the energy project ”Empalme” through American and Mexican territory, reaching more than 23 thousand miles and loaded more than 1500 tons during the last eight months. Tradelossa’s scope within the project began in the city of Laredo, Texas where Tradelossa…
Tradelossa has been working for one of our clients within the wind industry to complete the transportation of multiple sets of wind blades and hubs departing from the port of Altamira to the San Carlos wind farm, also located within the state of Tamaulipas. Dimensions: Hubs: 7.73 meters long, 4.48 meters wide, 4.35 meters high…
Tradelossa worked on the new Santa Lucia airport with hauling and rigging operations of three heavy transformers located at the Santa Lucia Airport base. The operations consisted of multiple loading and rigging of three transformers and their accessories in Texcoco, within the facilities of our clients with destination to the Santa Lucia Airport airbase,…
Tradelossa it’s always looking for innovation, this time has carried out the transport of two wagons for the Suburban Train project for the city of Toluca! The month of September has been a month where multiple projects of great significance for the Mexican industry have been accomplished. One of them it’s the two special…
Tradelossa has successfully delivered eleven transformers to one of our major clients across the country. All the components departed from our clients’ facilities, located at Apodaca, Nuevo Leon in the north of the country. Sharing the same point of origin, all the components were delivered in different points of great relevance for the Mexican…
Mexico, Wind Industry; Tradelossa has successfully completed another large scale operation for La Chalupa Wind Farm, located in American territory at Rio Hondo, Texas. The project consisted of the carriage of 49 sections in total of wind towers, classified as T1, T2, and T3, all towers were loaded at our clients’ facilities in Mexican…
The Tradelossa team concluded the transport of a 100-ton transformer, departing from the north of the country to Samalayuca, Chihuahua! Week of June 26th, our team in the field departed from the municipality of Apodaca Nuevo Leon to the state of Chihuahua; the complete operation consisted of the transport and unloading of a 100-ton…
We are bringing to our client’s Solutions for their projects at the Port of Guaymas! During the month of May, the Tradelossa group worked side by side to organize and plan operations for the Guaymas Project. The team set up operations using multiple modular equipments with low-bed platforms to perform a total of 57 trips…
Amazing rigging and handling operation for our clients at the state of Nuevo Leon! This month Tradelossa’s crew performed the loading and rigging of a 175-ton Frame at our clients’ facilities located in the north of Mexico, at the county of Santa Catarina, Nuevo Leon. The handling and rigging were performed by using our…
Tradelossa has completed the transport of a 110 ton Storage Tank! Leaving from the port of Manzanillo, Colima, the component was loaded and transported in our units to our clients’ facilities in Ciudad Juarez, Chihuahua. During the journey, our team had to face different challenges, one of the most remarkable ones was inside the…