During the month of June, 6 tanks were transported from Monterrey, N.L. to Altamira, Tamaulipas where they will be employed in the Chemical Industry. The tanks have been transported in groups of 2, with the purpose of not having to make unnecessary adjustments to the route, taking full advantage of the road modifications. Thanks to…
During the month of February, Tradelossa transported a Generator from Altamira Port to Durango. Delivery was made at a local thermoelectric plant where it was later rigged to set the Generator in its foundation. The base where the Generator was going to be installed was located 17m above ground and it had to be horizontally…
During the past 2 months, Tradelossa has successfully been handling one of the most important Wind Projects in Mexico: Sureste II. Ixtepec, Oaxaca was the final destination of 34 wind turbines which arrived at two different sites: Salina Cruz, Oax. Port and a Manufacturing Company at Monclova, Coah. This project included the transportation of different…
In September 2014, we executed a 4 transformers simultaneous transportation, they arrived at Salina Cruz Port, in Oaxaca in Southern Mexico. These transformers, with a weight of 120 tons each, were taken to an electric substation located in the Mayan Riviera, in the state of Quintana Roo. The dimensions of these transformers were: 5.27m x…
With great pleasure we announce that this month, we finished the transportation of the wind cargo in “La Rumorosa” Baja California, México. The project started in June of the current year, the inland moves were performed from Plaster City, California and the Port of Ensenada to the Site in Baja California. In total about 450…
Fecha: 2013 Carga: Tanques Peso: 17 Tons Dims: 7.65M Largo x 7.34M Ancho x 5.21M Alto Alcance: Proveer al cliente el transporte de 6 tanques desde Monterrey, a planta en Altamira, Tamaulipas.
As an incentive to help international business grow, we have recently obtained access to a spur located in Nuevo Laredo, México, a city that borders with the state of Texas, United States. This facility allows us to have more flexibility to perform MULTIMODAL TRANSPORTS when located in the US-Mexico border. Rigging jobs were succesfully…
Tradelossa performed a challenging rigging procedure for a low pressure steam turbine weighing 150 tons and measuring 10 meters long, 4 meters wide and 3.7 meters high, in Chihuahua, Mexico. Acknowledgments
During 2013, Tradelossa transported several structures for the new civil project, which consisted on a second floor for Mexico City’s Toll way system. Tradelossa provided the transportation for concrete beams, having an approximate configuration of 120m long. Supervision, escorts and permits for the 130 tons pieces. These transportation services were performed during the night due…
During the years of 2012 – 2013, we worked in the largest Oil Project in Latin America, which is located in Coatzacoalcos, Veracruz. On the month of February 2013, specifically, two large pieces were transported for 10 kilometers with a weight of 216 and 395 tons each. These pieces were transported with a double configuration…