Exportación y transporte de cadena de suministro de tanques de acero entre México y Estados Unidos

Tradelossa successfully exports steel tanks from Mexico to the U.S. with specialized transportation

Tradelossa successfully exports steel and their accessories, maintaining a Supply chain transportation operation between Mexico and the United States. The pieces were loaded in the city of Ocotlan, Jalisco, a municipality known for its manufacturing industry. For transport, we used specialized equipment adapted to the specific needs of the cargo, with the final destination in…

Read more
Tradelossa concluye transporte de vagones para el Tren Maya

Tradelossa wraps up project! – Transportation of Train sets for “Tren Maya” through the south of Mexico

  Tradelossa Completes the hauling of 44 Train sets for the “Tren Maya” Project We are thrilled to announce that the story of Tradelossa’s involvement in transporting the wagons for the Tren Maya has come to a successful conclusion. Here’s a brief timeline and overview of our team’s accomplishments throughout this significant project. On July…

Read more

Tradelossa – Movilizing Mexico’s LARGEST Transformer in history

    Tradelossa has successfully completed the movement and installation of Mexico’s largest transformer! This impressive transformer, designed to boost renewable energy generation in Mexico, arrived at the port of Guaymas from China in early April. Thanks to Tradelossa’s experience, equipment, and highly trained personnel, it was successfully transported to the Rafael Galván Maldonado Photovoltaic…

Read more

Tradelossa Revitalizes Tourism and Rail Infrastructure in Mexico with ‘Tren Maya’ Project

Tradelossa has once again embarked on a significant venture in Mexico, contributing to both the tourism and railway sectors with the ‘Tren Maya’ project. This substantial investment, located in the central and southern regions of the country, has been in progress since September 2023 and is set to continue through 2024. Our teams orchestrated the…

Read more

TRANSPORTING GAS COMPONENTS

Tradelossa has been invited to take part in a power generation project across the central part of Mexico. This project involved the transfer of a generator, a high-pressure turbine and a low-pressure turbine, the trio of pieces arrived at one of the country’s 5 major trading ports, the port of Altamira, located at the state…

Read more

Tradelossa on the Tren Maya Project

  Tradelossa was invited to be part of a project that will set a precedent within the public transportation industry and the tourism sector in Mexico. One of the largest mobilization projects in recent years in Mesoamerica. The challenge consists of the mobilization of 62,000 steel rails. Each with a length of 24 meters (945…

Read more
full-scale relocation of an automotive electric battery manufacturing plant, making over 100 trips in a 9-day timeframe.

2000 tons and 100 trips before New Year’s Eve.

  Tradelossa is a proudly Mexican company that’s been in the logistics industry for 50 years, standing out for its world class quality standards and services. Specializing in heavy and oversized cargo, Tradelossa also offers rigging, M.R.O. supply chain and forwarding solutions all over Mexico, USA, and Central America. Overcoming every challenge, employing the experience…

Read more

Door to Door Services to Dos Bocas

  Tradelossa was in charge of the transportation of multiple components and accessories within the Bajio area for our client’s facilities in Dos Bocas, Tabasco. Our client came to Tradelossa requesting door to door service from their facilities in the state of Jalisco to their facilities in Dos Bocas, Tabasco. The parts left at the…

Read more

Hauling and Rigging of the heaviest generator & turbine in Latin America

  The Mexican specialized transportation company, Tradelossa, completed the rigging of a 377-ton generator together with a 337-ton turbine for the renowned ”Tamazunchale” project. Located in the city of Tamazunchale, San Luis Potosi, Mexico. ”Tamazunchale” is considered the largest combined cycle power plant in Latin America in its capacity to generate electrical energy. Both pieces…

Read more
Parque Eólico Mesa Morenos

Mesa Morenos Windfarm Project

  Tradelossa recently started the transportation of multiple components for the ‘’Mesa Morenos’’ Windfarm, located in the northern state of Zacatecas, Mexico. The Project cargo operations  include the hauling of multiple Blades, Hubs, Nacelles with the next dimensions: Blades: 73.4 meters length, 4.70 meters width, 3.1 meters height with a total weight of 21 tons.…

Read more
Parque Eólico San Carlos

San Carlos Windfarm Project – Tradelossa

Tradelossa has been working for one of our clients within the wind industry to complete the transportation of multiple sets of wind blades and hubs departing from the port of Altamira to the San Carlos wind farm, also located within the state of Tamaulipas. Dimensions: Hubs: 7.73 meters long, 4.48 meters wide, 4.35 meters high…

Read more

Transformer delivery to Samalayuca, Chihuahua

  The Tradelossa team concluded the transport of a 100-ton transformer, departing from the north of the country to Samalayuca, Chihuahua! Week of June 26th, our team in the field departed from the municipality of Apodaca Nuevo Leon to the state of Chihuahua; the complete operation consisted of the transport and unloading of a 100-ton…

Read more

Guaymas Project: Delivery to Hermosillo

We are bringing to our client’s Solutions for their projects at the Port of Guaymas! During the month of May, the Tradelossa group worked side by side to organize and plan operations for the Guaymas Project. The team set up operations using multiple modular equipments with low-bed platforms to perform a total of 57 trips…

Read more

¡Multi-component transport throughout Mexico!

  We share with you our progress within one of our largest-scale projects of 2019 We began with the transportations of multiple components in different points of Mexico, moving 103 pieces for paint ovens, from the city of Queretaro, Queretaro, to the city of Hermosillo, Sonora. Dimensions: 6.2 meters long, 4.5 meters wide, 4.8 meters…

Read more

Hauling pipelines for port expansion!

  With more than three thousand tons transported, Tradelossa has completed one of its most ambitious projects for the first half of 2019! Since the beginning of May, Tradelossa had been given the task of completing one of the works with the highest volume of cargo so far this first half of the year, transporting…

Read more

Combined Cycle Power Plant in Tierra Mojada

We have successfully completed all heavy cargo deliveries for the project in Tierra Mojada. Our scope included the transportation of two GT’S, GTG’s,  LH, UH Machining components and a steam generator. In total, we move 12 freights, which meant moving 3,400,000 pounds and traveling more than 8077 miles. During this time we were able to travel…

Read more

Tradelossa bring the northern wings to all Mexico!

We are proud to share with you another achievement for us, during the course of this month we finish our role in the project Mezquite! Tradelossa has successfully finished after 6 months the final delivery of 300 blades along with 48 set of towers, during this time 444 specialized freight transportation was completed moving 25 million pounds and traveling around 29,000 miles in total. This time our scope included not only transportation but also port handling and…

Read more

GENSETS FOR CHIHUAHUA!

This time we completed the Emerging Energy Project which will have the capacity of 110MW, located in Aquiles Serdan, Chihuahua. At the beginning of July, we received twelve Gensets inside the port of Altamira, Tamaulipas; The transportation of all Gensets were carried out in two convoys with six on each group, making use of our…

Read more

“What an airplane!”

  We are glad to inform that we have started a brand-new project! We start our journey on Apodaca, Nuevo Leon, transporting an airplane’s fuselage and its accessories to Ciudad Juarez, Chihuahua. The project nicknamed as ‘‘El Biblioavion’’ (The library-plain) will be part of an educational initiative to develop for all the kids and teenagers…

Read more

Tradelossa, moving Casing Rows!

After an amazing execution, Tradelossa successfully finished a series of deliveries of casing rows. Coming from San Luis Potosi to Samalayuca, Chihuahua, the casing rows measured around 28.58 meters long, 4.30 meters wide and 2.31 meters high; weighing up to 35.7 tons. The components were transported up to 21,726 Km in 16 round trips, moving…

Read more

Welcome Faktor5!

It is our honor to present our latest acquisition, a top of the art last generation High Girder Bridge “Goldhofer Faktor 5”, named “Doña Pilar” in memory of our Co-founder. This new colossal system allows the transportation of payloads ranging from 350 to 550 Metric Tons, having a vertical stroke in the loading area of 1.80…

Read more

Heat Control with Tradelossa!

After an excellent display on both logistic and manpower in the project, Tradelossa ended a succession of inside jobs. The cargo, composed of Air cooled heat exchangers and their accessories (Module Assembly and steel structure) were loaded on the port of Altamira, Tamaulipas and delivered to a local industrial park. The proportions of the cargo were of 14.05…

Read more

Norte III Project

We have successfully finished the final delivery of all components for Norte III Project in Mexico. During the last three months, we worked on the Norte III Project, located in Samalayuca, Chihuahua. We made the transportation, port handling, lifting operations and storage for the different components, which they are extremely important for this Combine Cycle…

Read more

Helicopter Transportation!

Helicopter transportation Tradelossa was involved in the transportation of a helicopter, from San Luis Potosi to the Mexico City Airport. We are having an active participation in the air transport sector, we continue with the transportation of a helicopter for the Airport in Mexico City. The aircraft had dimensions of 6 meters long, 2.5 meters wide and…

Read more

Topolobampo II Rigging Job

We had successfully concluded the installation of three turbines and three generators for the Topolobampo II Project, located in Sinaloa, Mexico. The gas components had different dimensions: Turbine: 13.5 meters length, 4.8 meters wide, 3.8 meters height; weighing 289 tons each. Generator: 11.5 meters length, 4.1 meters wide, 4.3 meters height; weighing tons each. The heavy components were…

Read more

Airplane Transportation

Tradelossa has transported for the first time an airplane from Mexico City to Guadalajara in a seven-axis Faymonville platform. The transportation of an airplane measured 18 meters long, 4 meters wide, 4.2 meters high. The wings and tail had to be removed for a secure transportation, they were transported in another platform. The airplane will…

Read more

Topolobampo Project II

  We successfully performed the transportation of 24 boiler modules for the Topolobampo II Combine-Cycle Plant, located in Sonora. The modules were transported up to 2,200 kilometers, in a 15-day route per trip, using four trailers for the journey. The components ranged in weight of 233 tons to 245 tons. The dimensions of each module…

Read more

Reaching New Heights!

Tradelossa has completed the lifting and skidding of steam equipment for the Combined Cycle Project Empalme II, in Sonora. All the components were raised with a 570 metric ton Strand Jack Lifting System. Each rigging was adjusted to the dimensions of the different components for its correct positioning. The items raised were: Parts of a gas turbine,…

Read more

22 Boiler Modules!

  Tradelossa has simultaneously transported twenty-two boiler modules from Apodaca to El Carmen, Nuevo Leon. The twenty-two boiler modules ranged in size, measuring up to 27m long, 5.7m wide and 3.5m high, and weighing as heavy as 280t. The modules were transported 40km from the vendor’s facility to the project site CC Noreste using different…

Read more

Noreste Project

  Tradelossa has installed a gas generator and a set of gas turbines for the Combined Cycle Project Noreste in Nuevo Leon, Mexico. The gas generator was received in the project site, which has dimensions of 11.5 meters long x 4.1 meters wide x 4.32 high; weighing 289 tons, lifted and installed using Gantry system.…

Read more

Transformers Transportation, Mexico

  Fourteen transformers and accessories were delivered in to two different cities in Sonora, seven components were transported to Hermosillo and the rest to Ciudad Obregon. They were manufactured in Nuevo Leon, Mexico. The transformers were transported using hydraulic vehicular configurations. Once at site, the transformers were offloaded onto jacks and installed. The size of each…

Read more

Cogeneration Project, Altamira

This month we worked in the Cogeneration Project in Altamira, Tamaulipas; a combined cycle cogeneration plant which will deliver electricity and steam to the plastic production plant of a petrochemical company. We finished with the transportation and installation of a steam turbine, which dimensions were 11.2 meters long x 4.8 meters wide x 4.5 meters…

Read more

Rigging Job Ready!

These first few months have been of hard work just we finished with the installation of components for the Combined Cycle Power Plant Empalme I, in Sonora. This Project consisted in the rigging of different components with a 570 metric ton Strand Jack Lifting System. The items raised were: Parts of a steam turbine, 6.3 m (20.66…

Read more

DUBA, Salamanca Project

Delivery of three reactors for DUBA Project in Guanajuato. We conclude with the delivery of three reactors which will be used for the Clean Fuels Project for the Ultra Low Sulfur Diesel (DUBA) in Salamanca Refinery. If the pieces themselves are already striking, spectacular have been the tasks for transportation. We had to plan carefully…

Read more

1,2,3….81 Wind Blades Moved!

  Tradelossa concluded with the transportation of 81 blades, we started with this project last April, from TPI USA to Mexico, including its border crossing. During these almost seven months we have transported 81 wind components in a route of between 1,100 and 1,400 kilometers, to each park. Almost a total of 100,000 kilometers traveled…

Read more

La Jovita

Over the last 5 months we’ve worked in the project called “Baja California III La Jovita” at Ensenada, México. We’ve performed over 160 legal loads, 90 specialized transportation services and 2 oversized cargo transportations. That means the complete transportation of more than 1,000 metric tons, which had different origins, such as: Laredo (USA), Monterrey, Veracruz…

Read more

Moving Job Of The Year Award 2015

April 2015 On April 18th, the SC&RA; (Specialized Carriers & Rigging Association) Annual Contest was held in San Diego, CA. This year, Tradelossa decided to compete in the most challenging category, “Moving Job of the Year” which includes projects of Top leading companies from around the world. This category presents projects that used self-propelled hydraulic…

Read more

Los Ramones Pipelines

In early January, we worked in the “Los Ramones” Pipeline Project in Los Ramones, Nuevo Leon. Nearly 1,200 transport services were needed with an average of 90 kilometers per day. Each of these transports carried 4 pipelines with a diameter of 1.22 m. and 24 m of length. This project was concluded in early June.

Read more

MOVING JOB OF THE YEAR AWARD 2015

On April 18th, the Job of the year Award Competition was held by the SC&RA; (Specialized Carriers and Rigging Association). This year, Tradelossa decided to compete in the most challenging category, “Moving Job of the Year” which includes projects of top leading companies from around the world. This category presents projects that used self-propelled equipment,…

Read more

TRADELOSSA IN ACT MAGAZINE

We’d like to thank our friends at “Act Magazine” for the very special article they wrote on their May edition about this year’s SC&RA; Job of the Year Contest winners and participants. We invite you to read more about our winning project, the transportation of a reactor that weighed more than 880 Tons.

Read more

Ventika I and II Wind Farms

From December 2014 to November 2015, we performed the transportation of 84 wind turbines, coming from Altamira, Tamaulipas to General Bravo, Nuevo León. The 108 ton Nacelles, were the heaviest cargo of the project, having 12.5m long, 4.1m wide and 4.20m in height. For the transportation of the blades, specialized extendable equipment was used, due…

Read more

Certification ISO 9001:2008

We are very proud to announce our most recent achievement that we have accomplished a few days ago: Our ISO 9001:2008 Certification for “Transportation and Rigging Services of specialized and heavy loads”. ISO 9001:2008 is based upon the Eight Principles of Quality Management. Customer focus Leadership Involvement of people Process approach System approach to management…

Read more

TANKS TRANSPORT FOR CHEMICAL INDUSTRY

During the month of June, 6 tanks were transported from Monterrey, N.L. to Altamira, Tamaulipas where they will be employed in the Chemical Industry. The tanks have been transported in groups of 2, with the purpose of not having to make unnecessary adjustments to the route, taking full advantage of the road modifications. Thanks to…

Read more

STRAND JACK RIGGING

During the month of February, Tradelossa transported a Generator from Altamira Port to Durango. Delivery was made at a local thermoelectric plant where it was later rigged to set the Generator in its foundation. The base where the Generator was going to be installed was located 17m above ground and it had to be horizontally…

Read more

SURESTE II WIND POWER

During the past 2 months, Tradelossa has successfully been handling one of the most important Wind Projects in Mexico: Sureste II. Ixtepec, Oaxaca was the final destination of 34 wind turbines which arrived at two different sites: Salina Cruz, Oax. Port and a Manufacturing Company at Monclova, Coah. This project included the transportation of different…

Read more

4 TRANSFORMERS SIMULTANEOUS TRANSPORT

In September 2014, we executed a 4 transformers simultaneous transportation, they arrived at Salina Cruz Port, in Oaxaca in Southern Mexico. These transformers, with a weight of 120 tons each, were taken to an electric substation located in the Mayan Riviera, in the state of Quintana Roo. The dimensions of these transformers were: 5.27m x…

Read more

RAIL ROAD SPUR INAUGURATION OPENING

  As an incentive to help international business grow, we have recently obtained access to a spur located in Nuevo Laredo, México, a city that borders with the state of Texas, United States. This facility allows us to have more flexibility to perform MULTIMODAL TRANSPORTS when located in the US-Mexico border. Rigging jobs were succesfully…

Read more

Concrete Beams For Tollway Second Floor

During 2013, Tradelossa transported several structures for the new civil project, which consisted on a second floor for Mexico City’s Toll way system. Tradelossa provided the transportation for concrete beams, having an approximate configuration of 120m long. Supervision, escorts and permits for the 130 tons pieces. These transportation services were performed during the night due…

Read more

SUPER HEAVY OIL CARGO TRANSPORT

During the years of 2012 – 2013, we worked in the largest Oil Project in Latin America, which is located in Coatzacoalcos, Veracruz. On the month of February 2013, specifically, two large pieces were transported for 10 kilometers with a weight of 216 and 395 tons each. These pieces were transported with a double configuration…

Read more