Tradelossa is moving the Mexican wind industry and our work within the Sierra Juarez wind farm in the north of the country, within the state of Baja California.
Operations began during the month of May 2021 but have continued to date (June 2021) during this period Tradelossa has transported a large volume of parts for the wind farm.
26 T1 tower sections, 26 T2 tower sections, 16 T3 tower sections, 16 T4 tower sections, 15 Nacelles components, 15 Hubs, 15 Drive Train and finally 24 blades.
Dimensiones:
Nacelle: 12.94 meters long, 2.54 meters wide, 3.38 meters high with a total weight of 69.4 tons.
Drive Train: 7.79 meters long, 3.41 meters wide, 3.87 meters high with a total weight of 65.8 tons.
HUB: 5.50 meters long, 3.73 meters wide, 3.43 meters high with a total weight of 33.5 tons.
Blade: 74.3 meters long, 4.42 meters wide, 3.20 meters high, with a total weight of 23.4 tons.
T1: 15.84 meters long, 4.45 meters wide, 4.04 meters high, with a total weight of 85 tons.
T2: 24.92 meters long, 4.04 meters wide, 4.03 meters high, with a total weight of 84 tons.
T3: 28.84 meters long, 4.03 meters wide, 3.67 meters high, with a total weight of 68.5 tons.
T4: 33 meters long, 3.67 meters wide, 3.26 meters high, with a total weight of 52.5 tons.
All pieces left from the port of Ensenada, Baja California bound for the ”Sierra Juarez” wind farm in the town of La Rumorosa, Baja California.
This project will be of absolute importance for the locality and the state of Baja California.