Our work for the Fenicias Project started in November 2020, since then Tradelossa has been involved in the transportation of multiple wind components to the wind farm located in the state of Nuevo Leon in Northern Mexico.
During the course of the project 126 wind blades, 42 Nacelles, 42 Hubs and 42 Drive Trains were mobilized.
Dimensions:
Nacelle: 12.94 meters long, 2.54 meters wide, 3.38 meters high with a total weight of 69.40 tons.
Drive Train: 7.79 meters long, 3.41 meters wide, 3.87 meters high with a total weight of 65.85 tons.
Hub: 5.50 meters long, 3.73 meters wide, 3.43 meters high with a total weight of 33.57 tons.
Blades: 74.30 meters long, 4.42 meters wide, 3.20 meters high with a total weight of 23.42 tons.
The origin of the parts was varied, starting with the blades, most of which came from the city of Matamoros in the state of Coahuila.
The Hub, Nacell and Drive Train components however departed from the port of Altamira within the state of Tamaulipas.
All the parts were successfully delivered in a timely manner during the month of March of this year, following all the safety guidelines and requirements requested by our client for the completion of the project.
Tradelossa – Moving the industry 1973
Project cargo logistics México.