We are bringing to our client’s Solutions for their projects at the Port of Guaymas!
During the month of May, the Tradelossa group worked side by side to organize and plan operations for the Guaymas Project. The team set up operations using multiple modular equipments with low-bed platforms to perform a total of 57 trips from the port of Guaymas to our clients’ facilities in Hermosillo, Sonora.
The first operations were performed in the last week of May, Monday, May 25th. Since then our team has been working hard on a daily basis, delivering the biggest and heaviest components, picking them up at the port, and then delivering them in record timing to their final destination.
Below are the dimensions of the most important components:
9.92 meters long, 4.98 meters wide, 3.80 meters high, 152.9 tons
7.69 meters long, 3.88 meters wide, 3.43 meters high, 102.1 tons
9.16 meters long, 4.76 meters wide, 3.40 meters high, 143.6 tons
During the last week of May and the start of a new month, our team in and out of the site are under a constant exchange with each other as well as with our customers, carrying on with the operations but also overcoming any obstacles along the way, using our expertise and knowledge to exceed our clients’ standards and expectations.