From December 2014 to November 2015, we performed the transportation of 84 wind turbines, coming from Altamira, Tamaulipas to General Bravo, Nuevo León.
The 108 ton Nacelles, were the heaviest cargo of the project, having 12.5m long, 4.1m wide and 4.20m in height.
For the transportation of the blades, specialized extendable equipment was used, due to the length of the pieces.
Ventika Wind Farm has been granted two important awards by Cemex; “Development of Industrial Works” and “Innovation in Building Processes and Techniques”.
We at Tradelossa are very proud to have been part of such an important project that will generate 252 MW of clean energy.